Iv. operation – LABEC M-TIT-5 User Manual
Page 11
                                    Advertising
                                    
                                        
                                    
                                
                                 
IV. OPERATION
1. Installation and Connection 
1.1 Installation of the meter 
 Diag.13 
 
a. Put volume titration unit(3) and control unit on table, put stirrer on potential measuring unit(16) 
according to mentioned Diag13 and insert electrode pole(10); install beaker supporter (12) and 
beaker(13) respectively, put stirring drop(14) into beaker(13), then tighten stirrer(15) and 
beaker(13) with screws(25). 
Diag14
b. Before titration, burette must be cleaned especially when you are going to do titration of different
concentrations or different solutions. Installation of burette (4) is shown on left side as diag14, 
take out push rod tool from spare parts, connect it to the piston pole (51), shown as below 
10
                                    Advertising