LABEC M-TIT-5 User Manual

Page 14

Advertising
background image

1.2 Connection of the meter

Diag.18 Rear panel of volume titration unit










Diag.19

Diag.19 Rear panel of potential measurement unit Diag.20 Rear panel of control unit

a. Use control unit → volume titration unit special connecting line(33) to connect ‘titration

socket’ (18) under control unit and ‘Titration Socket/RS232’ (21) under volume titration unit.

b. Insert the joint of Stirrer (15) in the socket of ‘Stirrer’ under volume titration unit. Use TP-40

printer special connecting line to connect printer to ‘Printing Socket’ (20) under control unit.
Inset universal power line (41) into power socket of control unit. Screw down the fuse cover
off the fuse socket, put the fuseΦ5×20 (1A) from spare parts in the fuse socket, then tighten
the screw of the cover (fuse is already put in when the meter is ex-factory).

c. Use control unit → potential measuring unit special connecting line (34) to connect

‘Measuring Socket’ (19) under control unit with ‘Measuring Socket/RS232’ under potential
measuring unit.

13

Advertising