OmniSistem Q Scan User Manual

Page 32

Advertising
background image

IBM 25 PIN female

QSCAN MALE

9 pin

3..RECEIVE---<----red-----------<---------XMIT 3
2..SEND------>-------yel-------->---------REC 2
7..COMMON----><---------wht-----><--------GND 5
4..\

+12

6 KEYPAD POWER

5.. \ TIE TOGETHER (NULL MODEM) -12

7 KEYPAD POWER

6.. /
20./

THE PARALLEL CABLE IS A STANDARD 25 PIN STRAIGHT THROUGH MALE/MALE D-SUB.



MOUNTING


The mounting of the Q-Scan onto the Q-Beam will require the following parts provided with your Q-Scan and
comes inside the Q-Scan packaging: 4,5,6


Yoke extenders are necessary to provide clearance for the Q-Scan head for installations using the yoke in
the top mount position.

ALIGNMENT


Precise alignment of the port 10 that will project the beam into the Q-Scan has to be done prior to use. An
alignment tool has been provided to make this process simple. Follow the steps below to align the Q-Beam
to the Q-Scan.

• Step one – Remove the beam modules on ports 8,9,10

• Step two – Press Enter on the Back of the Q-Beam

• Step Three – Press Test Align on the Back of the Q-Beam

• Step Four – Press Up until the beam comes out of Port 10

• Step Five – Place Q-Scan Adjustment Tube in the module clamp of port 10 and tighten to finger tight

• Step Six – Remove the two black caps on the opposite side of the top rail of the Q-Beam. (Not the

two on the end of the projector). These are for the Red adjustment. The right ones is near the Red
LED on the top rail.

• Step Seven – Using a flat head screw driver adjust the beam so that it hits the exact center of the

centering mark on the top of the Q-Scan Alignment Tool as Illustrated below.

• Step Eight – Remove alignment tool.

• Step Nine – Place the Q-Scan into module ports 10 and 8 and tighten.

Advertising