Shelving installation, Power the bactronez, E 31 – Shellab BACTRONEZ User Manual

Page 31: Operation (continued), Bactronez

Advertising
background image

31 |

P a g e

OPERATION (CONTINUED)

S

HELVING

I

NSTALLATION

Install the three (3) metal bottom shelf spacers included with the BACTRONEZ on the
bottom shelf of the workspace chamber incubator. These spacers shield sample containers
from direct contact with the warm surface of the incubator and ensure heat dissipation and
uniformity.

1. Set the spacers on the bottom shelf of the workspace chamber incubator, side by

side, with the “SPACER” label facing outwards toward you.

2. Make sure to leave the incubator doors only partly open (1cm / 0.5 inches) after

installing the shelf spacers.

P

OWER THE

BACTRONEZ

1. Plug the power cord from the workstation into a suitable outlet (page 13).

2. Turn the power switch ON to verify that the workstation will power up.

3. The vacuum pump should turn on for a few seconds, and then turn off. If the pump does

not run, consult Sheldon Technical Support. If the vacuum pump runs for a long period of
time at higher altitudes it will require adjustment.

4. The following lights and displays should illuminate. If the lights do not illuminate, contact

Sheldon Technical Support:

a. The Green power switch.

b. The Chamber Gassing pilot light will illuminate for a few seconds, if all doors

are closed and the gas supply is turned on.

c. The Pass Box Doors sealed pilot light if the doors are closed.

d. The Auto Cycle Aerobic pilot light.

e. The green LED Set Temperature display on the main control panel.

Figure 21: Incubator

Shelf Spacer

Advertising