Slant/Fin Jaguar User Manual

Page 15

Advertising
background image

Jaguar Caravan Multiple and Cascading Boilers

15

Figure 10. shows typical field piped primary loops for Jaguar Multiple boiler systems. Each Jaguar boiler shall be

installed with a manual reset Hi Limit and a Manual Reset Low Water Cutoff being located on the boiler side of any shut

off valves and check valves.

Advertising