6. VENTING REQUIREMENTS

The Jaguar J-390C is a sealed combustion type boiler, it may be
installed and vented either as a direct vent boiler which all air for
combustion is obtained directly from outside or as a non-direct
vent boiler which air for combustion is taken from inside the boiler
room.

The Jaguar J-390C boiler must be vented by 4" diameter
PVC/CPVC schedule 40 pipe, or the proper 4” diameter stainless
steel venting system (see “vent material” on this page) through the
roof or sidewall.

FLUE GAS VENTING REQUIREMENTS
The Jaguar J-390C series boiler is a high efficiency, mechanically
forced draft boiler and, therefore, require different venting arrange-
ments than natural draft, lower efficiency boilers.

THE FOLLOWING INSTRUCTIONS MUST BE CAREFULLY
READ AND FOLLOWED IN ORDER TO AVOID ANY HAZ-
ARDOUS CONDITIONS DUE TO IMPROPER INSTALLATION
OF THE AIR INTAKE AND FLUE GAS VENTING SYSTEM.

The vent piping installation MUST be in accordance with these
instructions and with ANSI Z223.1-latest edition NATIONAL FUEL
GAS CODE, Part 7, Venting of Equipment. Other local codes may
also apply and must be followed. Where there is a conflict
between these requirements, the more stringent case shall apply.

The use of a vent damper is NOT permitted on this boiler series.

ADDITIONAL REQUIREMENTS FOR THE COMMONWEALTH

OF MASSACHUSETTS

When the Jaguar is installed and used in the Commonwealth of

Massachusetts, the following additional requirements pursuant to

Massachusetts code 248 CMR MUST be met:

(1). Exisiting chimneys shall be permitted to have their use continued when a

gas conversion burner is installed, and shall be equipped with a manual reset

device that will automatically shut off gas to the burner in the event of a sus-

tained back-draft.

(2)(a). For all side wall horizontally vented gas fueld equipment installed in

every dwelling, building or structure used in whole or part for residential pur-

poses, including those owned or operated by the Commonwealth and where

the side wall exhaust vent termination is less than seven (7) feet above finsi-

hed grade in the area of the venting, including but not limited to decks and

porches, the following requirements shall be satisfied:

1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of

installation of the side wall horizontal vented fueled equipment, the installing

plumber or gasfitter shall observe that a hard wired carbon monoxide detector

with an alarm and battery back-up is installed on the floor level where the gas

equipment is to be installed. In addition, the installing plumber or gasfitter

shall observe that a battery operated or hard wired carbon monoxide detector

with an alarm is installed on each additional level of the dwelling, building or

structure served by the side wall horizontal vented gas fueled equipment. It

shall be the responsibility of the property owner to secure the services of qual-

ified licensed professionals for the installation of hard wired carbon monoxide

detectors.

a. In the event that the side wall horizontally vented gas fueld equipment is

installed in a crawl space or an attic, the hard wired carbon monoxide detector

with alarm and battery back up may be installed on the next adjacent floor

level.

b. In th event that the requirements of this subdivision can not be met at the

time of completion of installation, the owner shall have a period of thirty (30)

days to comply with the above requirements; provided, however, that during

said thirty (30) day period, a battery operated carbon monoxide detector with

an alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monox-

ide detector as required in accordance with the above provisions shall comply

with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3. SIGNAGE. A metal or plastic identification plate shall be permanently

mounted to the exterior of the building at a minimum height of eight (8) feet

above grade directly in line with the exhaust vent terminal for the horizontally

vented gas fueled heating appliance or equipment. The sign shall read, in

print size no less that one-half (1/2) inch in size, “GAS VENT DIRECTLY

BELOW, KEEP CLEAR OF ALL OBSTRUCTIONS”.

4. INSPECTION. The state or local gas inspector of the side wall horizontally

vented gas fueled equipment shall not approve the installation unless, upon

inspection, the inspector observes carbon monoxide detectors and signage

installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

(b) EXEMPTIONS. The following equipment is exempt from 248 CMR

5.08(2)(a)1 through 4:

1. The equipment listed in Chapter 10 entitled “Equipment Not Required

TO Be Vented” in the most current edition of NFPA 54 as adopted by the

Board; and

2. Product Approved side wall horizontally vented gas fueled equipment

installed in a room or structure separate from the dwelling, building or

structure used in whole or part for residential purposes.

VENT AND AIR INTAKE MATERIALS

The vent and air intake system for direct or non-direct vent instal-

lation must be 4” diameter PVC/CPVC schedule. 40 pipe, or UL

listed single wall 4” diameter AL29-4C* stainless steel material.

The following manufacturers’ systems are approved for use within

a specified minimum and maximum equivalent vent length in this

manual.

When joining the various components of the listed stainless steel vent

systems, the manufacturers’ instructions should be closely followed to

insure proper sealing. Use sealant specified by vent system manufac-

turer for sealing of pipe and fittings, if required. When joining the

PVC/CPVC pipe and fittings, follow the instructions provided in this

manual. All connections must be liquid and pressure tight. DO NOT

use galvanized flue pipe or any plastic-type materials other than

PVC/CPVC Schedule 40.

* Maximum exhaust vent length = 100 feet

* Maximum air intake length = 100 feet

* Each elbow is eqivalent to 10 feet of straight pipe

Manufacturer

Type/System

Sealant

Heat-Fab. Inc.

Saf-T Vent

EZ Seal

Not Required

ProTech System,

Inc.

FasNSeal

Not Required

Flex-L International

Inc.

StaR-34

GE-IS806

Metal-Fab, Inc.

Corr Guard

Not Required

N/A

PVC pipe,

Schedule 40

PVC primer

and cement

N/A

CPVC pipe,

Schedule 40

CPVC primer

and cement

Advertising