Starting the high speed power meter application – EXFO IQS-1600 High-Speed Power Meter for IQS-500/600 User Manual
Page 22

Getting Started with Your High Speed Power Meter
14
IQS-1600
Starting the High Speed Power Meter Application
Starting the High Speed Power Meter
Application
Your IQS-1600 High Speed Power Meter module can be configured and
controlled from its dedicated IQS Manager application.
Note: For details about IQS Manager, refer to the IQS platform user guide.
To start the application:
1. From the Current Modules function tab select the module to use.
It will turn white to indicate that it is highlighted.
2. Click Start Application.
OR
Press the green LED push button on the front of the corresponding
module.
You can also double-click its row.
Note: Pressing the LED push button will not activate or turn on the module.
Note: To start the corresponding monitor window at the same time, click Start
App. & Monitor. The window opens on the Monitors function tab.
The main window (shown below) contains all the commands required to
control the High Speed Power Meter: