Vertical dimensions, 10 tons, Top discharge – WaterFurnace Envision (XL) User Manual

Page 5: Side discharge, Top view, Side view, Left return right return

Advertising
background image

ENVISION 7-25 TONS INSTALLATION MANUAL

6

CONTROL BOX

RIGHT RETURN

CONTROL BOX AND WATER

LEFT RETURN

2’ PRIMARY
SERVICE ACCESS
FOR LEFT RETURN

2’ PRIMARY

CONTROL BOX
RIGHT RETURN

SERVICE ACCESS
FOR RIGHT RETURN

2’ SECONDARY
SERVICE ACCESS

CONTROL BOX
AND WATER
LEFT RETURN

TOP DISCHARGE

2’ PRIMARY
SERVICE ACCESS
FOR LEFT RETURN

2’ PRIMARY
SERVICE ACCESS
FOR RIGHT RETURN

2’ SECONDARY
SERVICE ACCESS

SIDE DISCHARGE

56 in

[142.2 cm]

2 in [5.1 cm]

1 in [2.5 cm]

2 in [5.1 cm]

18.1 in [46 cm]

1.8 in [4.6 cm]

56 in

[142.2 cm]

22.6 in

[57.4 cm]

TOP PANEL
COVER

58.1 in [147.6 cm]

61.3 in [155.7 cm]

34.1 in

[86.6 cm]

2.9 in

[7.4 cm]

16.1 in

[40.9 cm]

TOP VIEW

Left or Right Return

SIDE VIEW

Left or Right Return

34.1 in

[86.6 cm]

58.1 in [147.6 cm]

61.3 in [155.8 cm]

21.6 in

[54.9 cm]

18.1 in

[46.0 cm]

1.42 in

[3.6 cm]

16.1 in

[40.9 cm]

2.9 in

[7.4 cm]

15.6 in

[39.6 cm]

12.5 in [31.8 cm]

36.3 in

[92.2 cm]

2.6 in [6.6 cm]

DRAIN CONNECTION

WATER OUT

WATER IN

ELECTRICAL
CONNECTIONS

ELECTRICAL
CONNECTIONS

AIR COILS

34.4 in

[87.4 cm]

4.0 in [10.2 cm]
2.2 in [5.6 cm]

10.1 in [25.7 cm]

2.0 in

[5.1 cm]

2.2 in

[5.6 cm]

7.2 in

[18.3 cm]

LEFT RETURN

RIGHT RETURN

15.6 in

[39.6 cm]

4.0 in [10.2 cm]

2.2 in [5.6 cm]

10.1 in [25.7 cm]

2.2 in

[5.6 cm]

12.5 in [31.8 cm]

36.3 in

[92.2 cm]

2.6 in [6.6 cm]

DRAIN CONNECTION

WATER OUT

WATER IN

AIR COILS

34.4 in

[87.4 cm]

7.2 in

[18.3 cm]

2.0 in

[5.1 cm]

TOP OR SIDE DISCHARGE

Legend

AP = Alternate Service Panel
BP = Blower Service Panel
CP

=

Control

Access

Panel

CMP = Compressor Service Panel

AP
CMP

AP
CMP

CP

CP

CP

CP

REV 2/11/08

Vertical Dimensions

7-10 Tons

Advertising