Vertical dimensions cont, 25 tons, Envision 7-25 tons installation manual 7 – WaterFurnace Envision (XL) User Manual

Page 6: Left return, Right return top discharge side discharge, Top view, Side view

Advertising
background image

ENVISION 7-25 TONS INSTALLATION MANUAL

7

LEFT RETURN

6.0 in

15.2 cm

13.0 in

33.0 cm

15.2 in

38.7 cm

19.0 in

48.2 cm

24.5 in

62.2 cm

18.0 in

45.7 cm

18.0 in

45.7 cm

16.0 in

40.6 cm

16.0 in

40.6 cm

16.0 in

40.6 cm

16.0 in

40.6 cm

1.5 in

3.7 cm

1.5 in

3.7 cm

2.0 in

5.1 cm

2.0 in

5.1 cm

34.0 in

86.4 cm

14.2 in

36.1 cm

14.2 in

36.1 cm

2.6 in

6.5 cm

6.5 in

16.5 cm

88.1 in

223.8 cm

RIGHT RETURN

TOP DISCHARGE

SIDE DISCHARGE

88.1 in

223.8 cm

86.3 in

219.1 cm

1.0 in

2.5 cm

66.0 in

167.5 cm

2.0 in

5.1 cm

1.0 in

2.5 cm

34.0 in

86.4 cm

2.9 in

7.3 cm

86.3 in

219.1 cm

88.1 in

223.8 cm

18.0 in

45.8 cm

13.8 in

35.1 cm

18.0 in

45.8 cm

13.8 in

35.1 cm

TOP PANEL
COVER

2.9 in

7.3 cm

66.0 in

167.5 cm

2.0 in

5.1 cm

DRAIN CONNECTION

ELECTRICAL
CONNECTIONS

40.4 in

102.6 cm

41.8 in

106.2 cm

AIR COILS

AIR COILS

41.8 in

106.2 cm

40.4 in

102.6 cm

15.2 in

38.7 cm

19.0 in

48.2 cm

24.5 in

62.2 cm

2.6 in

6.5 cm

6.5 in

16.5 cm

6.0 in

15.2 cm

13.0 in

33.0 cm

1.7 in

4.4 cm

1.7 in

4.4 cm

DRAIN CONNECTION

WATER OUT

WATER IN

WATER OUT

WATER IN

ELECTRICAL
CONNECTIONS

2’ PRIMARY

SERVICE ACCESS

2’ SECONDARY

SERVICE ACCESS

2’ PRIMARY
SERVICE ACCESS

2’ PRIMARY
SERVICE ACCESS

Legend

AP = Alternate Service Panel
BP = Blower Service Panel
CP

=

Control

Access

Panel

CMP = Compressor Service Panel

CONTROL BOX

AND WATER

RIGHT RETURN

CONTROL BOX

AND WATER

LEFT RETURN

CONTROL BOX

LEFT RETURN

AP
CMP

AP
CMP

CP

CP

CP

CP

CONTROL BOX

RIGHT RETURN

TOP VIEW

L or R Return

SIDE VIEW

L or R Return

TOP OR SIDE DISCHARGE

REV 8/16/07

Vertical Dimensions cont.

13-25 Tons

Advertising