10. If blower is installed, route blower electrical cord

through access holes in either side of fireplace.

Note:

Bushing may be moved if necessary. Plug

electrical cord into electrical outlet.

11. Carefully insert fireplace into cabinet mantel.

Be careful not to scratch or damage hearth

base, cabinet mantel or any laminate trim on

hearth base (VYGF models only). Remove

protective material from top of hearth base and

from front of fireplace (if any). Note: You can

secure fireplace to hearth or floor. Open lower

louver. Locate screw holes in bottom of base.

Tighten wood screws through these holes and

into hearth or floor.

12. Check all gas connections for leaks. See

Checking Gas Connections, page 15.

BUILT-IN FIREpLACE INSTALLATION

Built-in installation of this fireplace involves

installing fireplace into a framed-in enclosure.

This makes the front of fireplace flush with wall.

If installing a mantel above the fireplace, you

must follow the clearances shown in Figure 20,

page 13. Follow the instructions below to install

the fireplace in this manner.

Actual

Framing

Height

3

3

/

8

"

33"

Front Width

34

5

/

1

"

35

1

/



"

Depth

1

11

/

1

"

1

3

/

4

"

Models VYGF33PRB and VYGF33NRB

1. Frame in rough opening. Use dimensions shown

in Figure 13 for the rough opening. If installing

in a corner, use dimensions shown in Figure 14

for the rough opening. The height is 33" which

is the same as the wall opening above.

2. If using blower, install and properly ground

GA3555, three-prong 120 volt electrical out-

let, in fireplace. Follow instructions included

in kit (see Accessories, page 38).

3. Install gas piping to fireplace location. This in-

stallation includes an approved flexible gas line

(if allowed by local codes) after the equipment

shutoff valve. The flexible gas line must be the

last item installed on the gas piping. See Install-

ing Gas Piping to Fireplace Location, page 13.

4. Carefully set fireplace in front of rough opening

with back of fireplace inside wall opening.

5. Plug electrical cord into electrical outlet

installed in step 2.

6. Carefully insert fireplace into rough opening.

7. Attach flexible gas line to gas supply. See Con-

necting Fireplace to Gas Supply, page 14.

8. Attach fireplace to wall studs using nails or

wood screws through holes in nailing flange

(see Figure 15).

9. Check all gas connections for leaks. See

Checking Gas Connections, page 15.

10. Install perimeter trim after final finishing and/or

painting of wall (see Figure 7, page 9).

35

1

/

2

"

17

3

/

4

"

33"

Figure 13 - Rough Opening for Installing

in Wall

39

3

/

8

"

27

7

/

8

"

55

5

/

8

"

35

1

/

2

"

Figure 14 - Rough Opening for Installing

in Corner

Figure 15 - Attaching Fireplace to Wall

Studs

Nailing
Flanges

Nails or
Wood
Screws