INSTALLATION

Continued

Mantel Clearances for Built-In
Installation

If placing mantel above built-in fireplace, you must

meet minimum clearance between mantel shelf and

top of fireplace opening.

NOTICE: If your installation does

not meet the minimum clear-

ances shown, you must do one

of the following:

• raise the mantel to an accept-

able height

• remove the mantel

NOTICE: Surface temperatures

of adjacent walls and mantels be-

come hot during operation. Walls

and mantels above the firebox

may become hot to the touch.

If installed properly, these tem-

peratures meet the requirement

of the national product standard.

Follow all minimum clearances

shown in this manual.

Figure 20 - Minimum Mantel Clearances

for Built-In Installation

Supplied
Firebox
Hood
Must Be
Used at
All Times

Wire-mesh
Screen

Firebox

Noncombustible
Material May
Project Off this
Surface above
the Firebox
Hood

Mantel Shelf

13" 16" 19" 21"

2

1/2

"

6"

8"

10"

Note: All vertical
measurements are
from top of fireplace
hood opening to
bottom of mantel
shelf. These minimum
clearances replace any
other recommended
clearances supplied
with your ANSI Z21.11.2
approved gas logs.

Wall board or facing
material (above
firebox) may be of
combustible material,
including decorative
mantel ornaments or
other similar projec-
tions off of the facing
material.

Framing
Material

INSTALLING GAS pIpING TO
FIREpLACE LOCATION

WARNING: This appliance

requires a 1/2" NPT (National

Pipe Thread) inlet connection to

the pressure regulator.

WARNING: A qualified

service person must connect

fireplace to gas supply. Follow

all local codes.

CAUTION: Never connect pro-

pane/LP fireplace directly to the

propane/LP supply. This fireplace

requires an external regulator

(not supplied). Install the external

regulator between the fireplace

and propane/LP supply.

WARNING: Never connect

natural gas fireplace to private

(non-utility) gas wells. This gas

is commonly known as well-

head gas.

Installation Items Needed

Before installing fireplace, make sure you have

the items listed below.

• external regulator for propane/LP unit only

(supplied by installer)

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap (optional)

• tee joint

• pipe wrench

• approved flexible gas line with gas connector

(if allowed by local codes) (not provided)

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessories, page 38.