Single-thread installation – Comtech EF Data CSAT-6070 User Manual

Page 40

Advertising
background image

5 to 25 Watt Model C-Band Transceiver

Revision 0

Installation

MN/CSAT6070.IOM

2.4.2

S

INGLE

-T

HREAD

I

NSTALLATION

Figure 2-3. Single- Thread Installation


NT

Two RF Cables (TX/RX) and a

LNA are required for installation.

IMPORTA





1. Place unistrut bracket (1, Figure 2-1) on a flat surface.
2. Slide springnuts (9) into the channel of the unistrut bracket.
3. Fasten two pipe blocks (11) loosely to the springnuts using two bolts (6), two flat

washers (7), and two split washer (8).





Figure 2-4. Preparing the Pole

Bracket













2–6

Advertising