Single-thread installation – Comtech EF Data CSAT-6070 User Manual
Page 40
Advertising
![background image](/files/778928/content/doc040.png)
5 to 25 Watt Model C-Band Transceiver
Revision 0
Installation
MN/CSAT6070.IOM
2.4.2
S
INGLE
-T
HREAD
I
NSTALLATION
Figure 2-3. Single- Thread Installation
NT
Two RF Cables (TX/RX) and a
LNA are required for installation.
IMPORTA
1. Place unistrut bracket (1, Figure 2-1) on a flat surface.
2. Slide springnuts (9) into the channel of the unistrut bracket.
3. Fasten two pipe blocks (11) loosely to the springnuts using two bolts (6), two flat
washers (7), and two split washer (8).
Figure 2-4. Preparing the Pole
Bracket
2–6
Advertising