Lna installation, 5 lna i – Comtech EF Data CSAT-6070 User Manual
Page 58
Advertising
![background image](/files/778928/content/doc058.png)
5 to 25 Watt Model C-Band Transceiver
Revision 0
Installation
MN/CSAT6070.IOM
2.5.5 LNA I
NSTALLATION
1. Install gaskets on each port of the switch .
2. Position Low Noise Amplifiers (LNAs) on Port 2 and Port 4 of switch .
3. Secure each LNA with 10 bolts, lock washers and flat washers.
4. Position adapter, with termination, on Port 3 and secure with 10 bolts, lock washers,
and flat washers.
Figure 2-23. Switch Port Locations
IMPORTANT
If using a transmit reject filter, ensure that the OUTPUT flange of the filter is
against switch.
5. Position filter on Port 4 of switch and secure with four bolts, lock washers, and flat
washers, two bolts at each end.
6. Set assembly aside for later installation.
2–24
Advertising