Installation of the 9120k pulser kit – Gasboy 9120K User Manual
Page 5

MDE-4618 9120K Pulser Installation Instructions • December 2006
Page 5
Installation of the 9120K Pulser Kit
Installation of the 9120K Pulser Kit
To install the 9120K Pulser Kit, proceed as follows:
1
Turn off and lock out all power to the system. Follow Occupational Safety and Health
Administration (OSHA) Lock-Out and Tag-Out procedures.
2
Remove front and back doors and top cover from the unit.
3
Install Spirol pins (Q10038-26 and Q10038-35) into the hole in the register's Totalizer shaft
(054526). The pin should be set with both ends protruding equally on the coupling’s outer
surface (see
).
Figure 1: Exploded View
Pulser and Gear Assembly
Screw, Metric M8 X 18 (11)
Union Conduit Male & Female 1/2 (17)
Elbow Conduit 1/2 X 90 Male
& Female (14)
Bushing, Reducing (16)
Junction Box
Conduit
Spirol Pin .062 X .750 (5)