Gasboy Q Series User Manual
Page 3
Advertising

020897 Rev. 06/12/03
Page 3
7. Install/insert the grommet (item 10) into the existing vent hole in
the left side column (view from junction box side). (Figure 6)
Figure 6
8. Remove the compression sleeve and compression nut from the
top elbow of sump overflow assembly (item 1), then pre-
assemble the sleeve and nut over the vent tube as shown in
Figure 7.
Figure 7
9. Connect the pre-assembled vent tube to the compression
elbow and insert the other end into the grommet in the side
column. (Figure 8)
Figure 8
10. Tighten all loose connections. (Figure 9)
11. Turn on power to the pump. Open the shear valve’s poppet for
fuel flow into the pump. Close and lock the doors.
Figure 9
Advertising