Gasboy M06430K00X User Manual

Introduction, Required tools and materials

Advertising
background image

MDE-4522A Atlas™ Self-Contained Pump Vapor Recovery Kit M06430K00X Installation • November 2006

Page 1

Introduction

This manual provides installation instructions for Atlas

Models 8700K, 8800K, 9100K,

9800K balanced system Vapor Recovery (VR) kit M06430K00X.

Self Contained Vapor Recovery Kits

Required Reading

Before installing a kit, the installer must read, understand, and follow:

• This manual
• NFPA 30A, The Automotive and Marine Service Station Code
• NFPA 70, The National Electric Code
• Applicable federal, state and local codes and regulations

Failure to do so may adversely affect the safe use and operation of the equipment.
Note: This kit must be installed by a Gasboy Authorized Service Contractor (ASC) to ensure

warranty.

Required Tools and Materials

The following tools are needed to install the VR kit:

• Standard wrench set
• Drill (capable of accepting a 5/8-inch masonry drill bit)
• 5/8-inch masonry drill bit
• Flat-tip screwdriver
• Cross-tip screwdriver
• Level (capable of checking vertical plumb)
• Pipe compound (UL

®

-classified gas- and oil-resistant)

• White lithium-based grease

Kit No.

Description

M06430K001

VR Kit, 1 Grade 1 Hose Pump, Electronic

M06430K002

VR Kit, 2 Grade 2 Hose Pump, Electronic

M06430K003

VR Kit, 1 Grade 2 Hose Pump, Electronic

M06430K004

VR Kit, 1 Grade 1 Hose Pump, Mechanical

M06430K005

VR Kit, 2 Grade 2 Hose Pump, Mechanical

M06430K006

VR Kit, 1 Grade 2 Hose Pump, Mechanical

MDE-4522A

Atlas

Self-Contained Pump Vapor

Recovery Kit M06430K00X Installation

November 2006

Advertising