Completing installation – Gasboy Atlas Rain Baffle Air Gap Kit User Manual
Page 8
Advertising

Installing the Rain Baffle Air Gap Kits
© 2006 GASBOY
7300 West Friendly Avenue • Post Office Box 22087
Greensboro, North Carolina 27420
Phone 1-800-444-5529 •
• Printed in the U.S.A.
MDE-4548 Atlas™ Rain Baffle Air Gap Kit M06804K002 Installation Instructions • February 2006
.
Atlas
™
is a registered trademark of Gasboy.
4
Replace the old lower door panel (refer to
) with the new door panel (refer
to
and
).
5
Repeat steps
on the opposite side of the unit, if the lower door panel on that side needs to
be replaced.
Completing Installation
Inform the manager/owner that power will be restored to the unit and then restore power using
normal procedures. Remove the lockout/tagout and return to normal operation.
Advertising