The following paragraph provides step by step instructions for installation of the outdoor WGT.
a. Install the WGT in a non hazardous area according to Figure 1-2 .
b. Install a Master WGT and a Router WGT (one or more) in each station according to station
topology.
• The Master WGT, as opposed to the Router WGT, is connected to the FCC controller using
shielded S-CAT5E LAN cable. Install the master WGT as close as possible to the FCC
controller.
• Install the Router(s) WGT in a line of sight with the Master WGT, within a distance not
exceeding 15 meters (approximately 50 feet).
• The Master unit and the Router unit activate the RF mesh network in the station.
• For ease of maintenance, it is recommended not to install the WGT higher than two meters from
the ground. However, the higher will be the unit, the better will be the RF cover.
• The installation procedures must meet all safety regulations according to local state regulations.
• Mechanical Installation
- Remove the WGT cover and install the unit on a smooth surface using four screws via holes
located at the four corners of the unit.
- Refer to Figure 1-4 for the location of the four holes.
- Install the WGT vertically where the two cable holes are located at the bottom section of the
unit (see Figure 1-5).
- Connect a 12-28 VDC (stabilized), 500 mA ( maximum) power supply, for the Master and
Router WGTs.
- For the master WGT, connect a shielded S-CAT5E cable using RJ-45 connector.
- Connect the wiring through UL listed glands or appropriate metal tubing. The large hole can
host a gland for cables in diameter between 0.230” to 0.530” (5.8 to 13.9 mm) and the small
hole can host a gland for cables in diameter between 0.114” to 0.250” (2.9 to 6.4 mm).
Tighten the glands in order to prevent leak of water or gasses through conduits, cables and
conductors.
- In case you are not using one of the two wiring holes be sure to seal it properly.
- When installing cables into the WGT box, do not damage unit sealing (IP66 protection).
- Assemble the unit cover using the four coarse pitch screws and than install the four screw
clip-on knobs.
• Perform Router and Master unit setup prior to installation according to instructions provided in