Nortec ME Direct Feed Installation User Manual

Page 34

Advertising
background image

34 Installation

– All cables from the hydraulic manifold mounted inside the AHU/air duct must be lead via cable gland(s)

out of the duct.

– Ensure cables are secured in such a way that the insulation is not damaged by sharp edges and so

that they do not create a trip hazard.

– Observe and maintain maximum cable length and required cross section per wire.
– The mains supply voltage must match the respective voltage stated on the rating plate.

Advertising