MAR SPLIT UNIT - UNPACKING AND

INSPECTION
1. Visually inspect the exterior of the shipping

container and skid. Any severe damage noted

should be reported to the delivery carrier and a

concealed damage claim filled subject to internal

inspection with the carrier representative present.
2. Remove the packing and remove the side

panels, then remove the shipping bolts securing

the unit to the skid.
3. Remove screws and all panels from cabinet and

inspect for any concealed damage. Notify carrier of

any concealed damage claims as stated in step 1

above.
4. Remove all internal packing from unit

compartment.
5. Check that refrigerant lines do not rub or touch

lines or surfaces and that all wires are securely

fastened to their terminals.
6. Use clean damp cloth or disposable paper towel

to wipe the exterior surface of the cabinet clean.
7. See DATA PLATE on the cabinet base and

check that the location source voltage corresponds

with the voltage specified on the data plate.
CAUTION - Improper voltage supplied to the

ice maker will void the warranty.

LOCATION AND LEVELING
1. Position the MAR SPLIT UNIT in the selected

permanent location which could be on top of ice

storage bins, on the side of cold storage room

supported by special pre-set stands or, in case of

fishing vessel installation, inside or on top of the

fish hold.
Note: See sales information for suggested bin

applications. Most will require the MAR unit to

be placed sideways on the bin’s top.
See illustration at the bottom of this page.
2. After having placed the unit on the support

stand or bin, place thin rubber pads between the

ice machine base and the stand to level the

cabinet on both the left to right and front to rear

directions. There are holes in the base of the

cabinet, use them to secure the unit to the stand

with the appropriate (stainless steel) bolts.
Make sure to leave enough space around the unit

to allow access to internal components for

inspection and servicing and also for the fitting of

the ice chute.
3. If installing a separate condensing unit, position

the condensing unit in its location and to mount it

firmly to avoid a sudden shift that would endanger

the refrigerant lines. Precautions to be observed

vary with the kind of situation in which the unit is to

be placed. The area should be well ventilated to

permit escape of refrigerants in case unit develops

a leak.

MAR1400 & MAR2000

December 2000

Page 12

Water and

Refrigeration

Connection

Area

Top View of MAR on 60”w x 40”d bin

Chute

MAR Unit

Electrical

Connection

Area