Start-Up

Condensing Unit:
Follow the manufacturer’s start up check list.
MAR1400 or MAR2000:
After system has been charged and checked-out

make sure to correctly position the ice chute.

Perform a through re-check of entire system as per

following steps.
1. Make sure to open the water supply line shut-off

valve and that water flows freely from float valve

into the drum basin.
2. Connect power to the system in order to start-up

the evaporator drive motor, the water pump and

the compressor.
Note: For the first 8 - 10 minutes after power is

connected to the MAR unit, only the water pump

and the time delay relay are powered. There will

be a red light in the upper left corner of the time

delay relay. After the time delay relay’s off time

has expired, there will be red lights in both the

upper left and the upper right corners of the front

of the relay. At that time the liquid line valve and

contactor will power up, and the unit will soon

begin to make ice.
3. Observe that evaporator drum rotates in the

right direction, namely towards the scraping blade.
WARNING - Care must be taken to ensure of

the correct rotation direction of drum.
4. Check compressor head and suction pressures.

If not within system design limits, determine why

and take corrective action.
5. For a water cooled condensing unit check the

water flowing out of the condenser to see if it

drains properly.
6. Observe if ice skin tends to cover entire drum

surface and is being scraped-off correctly by the

blade.
7. Check liquid line sight glass and expansion

valve operation. If there are indications that more

refrigerant is required leak test all connections

before adding refrigerant.
8. Observe oil level in compressor crankcase sight

glass and add oil as necessary to bring level to

center of the sight glass.
9. Let the system operate for at least two hours,

then check one by one the operation of each

individual control and protective device for proper

setting.
10. Eliminate any excessive vibration or noise and

pulleys misalignment.
11. Observe that evaporator drum is frosted all

over from end to end. If this is not the case setting

of refrigerant expansion valve may be necessary.
For proper adjustment of this valve turn the valve

adjustment stem of one eight of a turn

counter-clockwise to allow more refrigerant to flow

until the evaporator drum surface is evenly frosted

from end to end.
In case there is an excessive frost back on the

suction line and frost start to form on compressor

suction service valve, slightly turn clockwise the

expansion valve setting stem until the frost back

on the compressor service valve melts over.
Indicative Operating Pressure - With Fresh

Water Supply - Water Cooled System

Head Pressure (bar) 17 (245 PSIG)

Suction at EPR valve: 1.6 (22 - 23 PSIG)

MAR1400 Drum R.P.M. (thick ice) 1.5

MAR2000 Drum R.P.M. 2.4

12. In relation to the desired quality of scale ice,

review the position of float reservoir to see if water

in drum reservoir is at the corresponding level.
The correct water level is:

115-120 mm

4.5” to 4.75”

13. Observe that ice slides through spout opening

with no difficulties. Clearance between the blade

and drum surface must be 0,10 m/m (.004”).

Transparent plastic chute must be flat.
14. When the system is performing satisfactorily

go over with the owner/user to all significant

specifications, the start-up and operations. Answer

all questions about the care and attention to give

to the ice making system.

MAR1400 & MAR2000

December 2000

Page 18