Watson-Marlow 323Dz User Manual

Page 44

Advertising
background image

Watson-Marlow 323Dz User Manual

44

Select enough tube length for the curve of the pump track. Slide the tube into
the open pumphead. The tube must not be twisted or stretched against the
rollers.
Ensure the tubing locates in the centre of the tube clamps. Carefully lower the
track. Check that the tube is not crushed in the clamps or over stretched.

When using Marprene tubing

Re-tension new tube after the first 30 minutes of running. Stop the pump. Release the
flip top. Allow the tube to resettle naturally across the rollers. Re-clamp the tube. Re-
start the pump. This will correct the normal stretching that occurs with new Marprene
tube. The correct tension is essential for good tube life.

21.3 313D and 314D
pumphead spares

Spare

Description

1

033.3411.000

313D three-roller pumphead

2

033.3431.000

313X extension three-roller pumphead

1

033.4411.000

314D four-roller pumphead

2

033.4431.000

314X extension four-roller pumphead

1

033.3511.000

313D2 three-roller pumphead for 2.4mm tube

2

033.3531.000

313X2 extension three-roller pumphead for 2.4mm
tube

1

033.4511.000

314D2 four-roller pumphead for 2.4mm tube

2

033.4531.000

314X2 extension four-roller pumphead for 2.4mm tube

Advertising