Powering on the router, Checking before power-on, Checking/operating after power-on – H3C Technologies H3C MSR 50 User Manual

Page 44

Advertising
background image

36

Figure 34 Set terminal type

Powering on the Router

Checking before power-on

Check according to the following items before powering on the router.

Whether the power cord and PGND wire are correctly connected.

Whether the voltage of the power supply complies with the requirement of the router.

Whether the console cable is correctly connected, whether the PC or terminal for configuration is
open, and whether the settings are done.

Whether the CF card is loosened.

WARNING!

Before powering on the router, the user should be aware where the switch of the power supply to the
router is located, so that the power supply can be disconnected in time once accidents occur.

Powering on the router

Turn on the site power.

Turn on the power switch of the router.

Checking/operating after power-on

After powering on the router, check that:

The LEDs on the front panel show that the router is operating normally.

The console terminal displays normally.

For local configuration, after you power on the router, you can see the startup banner. See section

Startup Process

”.

Advertising