Connection procedure – SMA AUTOMATIC SWITCH BOX XL User Manual

Page 28

Advertising
background image

Electrical Connection

SMA Solar Technology AG

28

AS-BOX-XL-IEN094410

Installation Guide

Connection Procedure

1. Prepare the cables as described in Section 5.3 ”Preparing the cables” (page 24).
2. Connect PE and N to the "=AS-X4 PV System" terminal according to the labels.
3. Connect L1, L2, and L3 to the "=AS-X4/PV System" terminal according to the labels.

☑ The PV system is now connected to the Automatic Switch Box.

Advertising