SMA AUTOMATIC SWITCH BOX XL User Manual

Page 41

Advertising
background image

SMA Solar Technology AG

Electrical Connection

Installation Guide

AS-BOX-XL-IEN094410

41

8. Insert cable opening including cable into the

enclosure from the outside.

9. Attach mounting plate of the two-part cable

opening and fasten the screws hand-tight.

10. Repeat steps 1 - 9 for the remaining control and

sensor cables. A second two-part cable opening is supplied for this.

☑ The communication cables have now been routed into the Automatic Switch Box.

Advertising