SMA AUTOMATIC SWITCH BOX XL User Manual
Page 41
Advertising
SMA Solar Technology AG
Electrical Connection
Installation Guide
AS-BOX-XL-IEN094410
41
8. Insert cable opening including cable into the
enclosure from the outside.
9. Attach mounting plate of the two-part cable
opening and fasten the screws hand-tight.
10. Repeat steps 1 - 9 for the remaining control and
sensor cables. A second two-part cable opening is supplied for this.
☑ The communication cables have now been routed into the Automatic Switch Box.
Advertising