SMA Solar Technology AG

Electrical Connection

Installation Guide

AS-BOX-XL-IEN094410

33

Cable Sizing

The cable type and routing method must be suitable for the application and the deployment location.
Select the cable according to the upstream fuse on the grid side.
The required cross-section of the cables depends on the upstream fuse.

Connection Procedure

1. Prepare the cables as described in Section 5.3 ”Preparing the cables” (page 24).
2. Connect PE and N to the "=AS-X1 Load Meter" terminal according to the labels. The second

connection terminal "N" is not assigned.

3. Connect L1, L2 and L3 to the "=AS-X1 Load Meter" terminal according to the labels.

☑ The consumption meter is now connected to the Automatic Switch Box.

ATTENTION!
Destruction of the Automatic Switch Box due to missing back-up fuse.

• Use max. one 160 A fuse as back-up fuse in the distribution.