Initial installation – Enviro C-10914 User Manual

Page 18

Advertising
background image

and attach to the exterior wall with the

four screws provided. Before attaching

the vent termination to the exterior wall,

run a bead of non-hardening mastic

around the edges, so as to make a seal

between the termination and the wall.

The arrow on the vent termination should

be pointing up, insure that the proper

clearances to combustible materials are

maintained.

STEP 5. Before connecting the horizontal run of

the vent pipe to the vent termination,

slide the black decorative wall thimble

cover over the vent pipe.

STEP 6. Slide the appliance and vent assembly

towards the wall, carefully inserting the

vent pipe into the cap assembly. It is

important that the vent pipe extend into

the vent cap a sufficient distance with a

minimum of 11⁄4” (3.2 cm) overlap. Secure

the connection between the vent cap pipe

and the vent cap by attaching the two

sheet metal straps extending from the

vent cap assembly into the outer wall of

the vent pipe. Use the two sheet metal

screws provided to connect the straps

to the vent pipe. Bend any remaining

portion of the sheet metal straps back

towards the vent cap, so the decorative

wall thimble will conceal it (see left image

in Figure 18).

STEP 7. Slide the decorative wall thimble up

to the wall surface and attach with the

screws provided. Apply decorative brass

or chrome trim if desired (see right image

in Figure 18).

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 19: Installing Vent Cap with Vinyl Siding Stand-

Off.

Figure 20: Installing Horizontal Vent Termination.

every 36 inches (915 mm). Wall straps are available for this purpose, also when running horizontal pipe

minimum clearances to combustibles must be maintained; 2 inches (51 mm) at top, 11⁄2 inches (38

mm) at sides, 11⁄2 inches (38 mm) at bottom.
STEP 3.
With the pipe attached to the stove in the correct location, mark the wall for a 10” (25.4 cm) x

10” (25.4 cm) square hole (refer to Figure 17). The center of the square hole should match the

center line of the horizontal pipe. Cut and frame the 10” (25.4 cm) x 10” (25.4 cm) hole in the

exterior wall where the vent will be terminated. Refer to Figure 8. If the wall being penetrated

is constructed of non-combustible material i.e. masonry or concrete, a 7 inches (17.8 cm) hole

is acceptable.

STEP 4. Position the horizontal vent termination in the center of the 10” (25.4 cm) x 10” (25.4 cm) hole,

18

Advertising