Initial installation – Enviro C-10914 User Manual

Page 20

Advertising
background image

STEP 3. To install the Round Support Box/Wall

Thimble in a flat ceiling, cut a 10” square

hole in the ceiling, centered in the hole

drilled in Step 2. Frame the hole as shown

in Figure 23.

STEP 4. Assemble the desired lengths of black pipe

and elbows necessary to reach from the

appliance adapter up through the Round

Support Box. Insure that all pipe and

elbow connections are in their fully twist-

locked position.

STEP 5. Cut hole in the roof centered on the small

hole placed in the roof from Step 2. The

hole should be of sufficient size to meet

minimum requirements for Clearance

to Combustibles, as specified. Continue

to assemble lengths of pipe and elbows

Figure 23: Wall Framing for Hole for Vertical

Installation.

necessary to reach from

the ceiling support box

up through the roof line.

Galvanized

pipe

and

elbows may be utilized

in the attic, as well as

above the roof line.

The galvanized finish is

desirable above the roof

line, due to the higher

corrosion resistance.

STEP 6. Once the pipe sections

have been joined, and

run up through the hole

in the roof, slip an elbow

strap over the exposed

sections,

bend

the

support straps outwards,

and push the elbow strap

Initial Installation

QUALIFIED INSTALLERS ONLY

V

ERTICAL

I

NSTALLATION

:

STEP 1. Check the instructions for required clearances (air spaces) to combustibles when passing

through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces.

Do not pack air spaces with insulation.

STEP 2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to

the position of the appliance flue exit, and mark the location where the vent will penetrate

the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole

previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine

if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to

relocate the appliance, or to offset, to avoid cutting load bearing members.

Vertical

Termination

Storm Collar

Flashing

Roofing nails

Elbow Strap

Figure 24: Vertical Vent Termination Installation.

20

Advertising