Solare Datensysteme Solar-Log User Manual

Page 209

Advertising
background image

209

Schüco

IPE SN series

Procedure

1.

Open the inverter as shown in the inverter‘s instructions.

2. Connect terminals RS485+ and RS485- on all inverters to the two data cable wires in accordance with

the inverter instructions.

3. Terminate in the last inverter in accordance with the inverter instructions.

4. Close inverters.

Allocate communication address

•

Recommendation: Continuous numbering starting with 1.

•

Setting: Using the inverter operating display

•

Procedure: Start according to the inverter‘s instructions

Advertising