3 installing the sfp transceiver – PLANET GS-4210-8P2T2S User Manual

Page 26

Advertising
background image

User’s Manual of GS-4210-8P2T2S

Step 5:

After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack

,

as shown in

Figure 2-1-6

.

Figure 2-1-6 Mounting Managed Switch in a Rack

Step 6:

Proceeds with Steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply power to

the Managed Switch.

2.2.3 Installing the SFP transceiver

The sections describe how to insert an SFP transceiver into an SFP slot. The SFP transceivers are hot-pluggable and

hot-swappable. You can plug in and out the transceiver to/from any SFP port without having to power down the Managed Switch,

as the

Figure 2-1-7

shows.

Figure 2-1-7 Plug in the SFP transceiver

26

Advertising
This manual is related to the following products: