6 mounting, 1 preparing for mounting – Moog RKP-II User Manual

Page 41

Advertising
background image

6 Mounting

Preparing for mounting

© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 33

6 Mounting

Mounting

6.1 Preparing for mounting

Preparing for mounting

Procedure:

1. Pump has been unpacked.

Ö Chap. "5.1 Unpacking the Pump", Page 29

2. The required supplementary documentation is at hand.

3. The hydraulic plans from the machine / equipment manufacturer have

been made available.

4. The required standard tools and mounting material are at hand.

For pumps in explosive areas, the supplementary documentation should
also be observed:

Ö User Manual RKP II Explosion-Proof

For any and all tasks to be performed on the pump, suitable personal
protective equipment should be worn.
Ö Chap. "2.2.4 Work Safety", Page 9

DANGER

Risk of injury and property damage as a result of leaking
operating fluid!
Any operating fluid that sprays out under high pressure
because of improper mounting may lead to serious injury or
property damage.

• Only trained personnel should be allowed to mount the

pump.

• Check the cleanliness of the mounting surface.

• Observe the tightening torques for the fasteners.

Ö Chap. "12.2 Tightening Torque", Page 63

• Use only specified fasteners (quantity/type).

• Make sure the proper flange and screws are being used

as per standard (e. g. SAE).

• Check for the existence and use of the proper O-rings.

• Use the correct sealant based on the operating fluid.

• Mount all connections to be hydraulically sealed.

• Do not exceed the maximum operating pressure in the

system.

• Do not exceed the maximum body pressure.

DANGER

Serious bodily injury!
Starting-up the machine/equipment during the mounting
process may lead to serious bodily injuries or death.

• Make sure that the machine/equipment cannot be

switched on.

The pump is pre-assembled at the factory.

Advertising