8 maintenance and repairs, 1 monitoring – Moog RKP-II User Manual

Page 61

Advertising
background image

8 Maintenance and Repairs

Monitoring

© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 53

8 Maintenance and Repairs

Maintenance and Repairs

8.1 Monitoring

Monitoring

For pumps in explosive areas, the supplementary documentation should
also be observed:
Ö User Manual RKP II Explosion-proof

For any and all tasks to be performed on the pump, suitable personal
protective equipment should be worn.
Ö Chap. "2.2.4 Work Safety", Page 9

Tasks

Intervals

Check pump for leakage

Daily

Check pump for noises

Daily

Check that fasteners are tightened

Monthly

Check the machine's operating temperature
at constant operating conditions

Weekly

Check the machine's operating fluid level

Daily

Check the operating fluid quality

Annually or every 2000

operating hours

Tab. 15: Monitoring

Advertising