4 event scheduling – SRS Labs Projector 8953H User Manual

Page 93

Advertising
background image

93

4. Management with Web browser software

4.4 Event Scheduling

The scheduling function enables to setup scheduled events including power on /

power off. It enables to be “self-management” projector.

• You can schedule the following control events: Power ON/OFF, Input

Source and Transferred Image Display.

• The power on / off event has the lowest priority among the all events that are

defined at the same time.

• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (75)

• The priority for scheduled events is as follows 1) specific date 2) weekly 3)

daily.

• Up to five specific dates are available for scheduled events. Priority is given to

those with the lower numbers when more than one event has been scheduled

for the same date and time (e.g., ‘Specific day No. 1’ has priority over ‘Specific

day No. 2’ and so on.

• Be sure to set the date and time before enabling scheduled events. (77)

NOTE

Advertising