Installing the rack rails – SUPER MICRO Computer SUPERSERVER 6014P-8R User Manual

Page 21

Advertising
background image

Chapter 2: Server Installation

2-5

Installing the Rack Rails

Begin by joining together the front and rear rack rails. Do this by inserting

the standoffs from one rail into the grooves of the other rail and then pulling

the rails in opposite directions so that the standoffs slide into the narrow

part of the groove.

Take this assembly and hold it up to the rack (at the desired height) to

determine the proper length - the standoffs/groove allows you to adjust the

length of the rail to fit the depth of the rack. After adjusting the rail assem-

bly to the proper lenght, secure the it to the rack with the screws provided.

Then repeat the procedure for the other side, making sure both rails are

secured to the rack at the same height.

Locking Tabs

The chassis rails have a locking tab, which serves two functions. The first

is to lock the server into place when installed and pushed fully into the rack,

which is its normal position. Secondly, these tabs also lock the server in

place when fully extended from the rack. This prevents the server from

coming completely out of the rack when you pull it out for servicing.

Figure 2-2. Installing the Chassis Rails

Advertising
This manual is related to the following products: