Main transformer test, Perform the main transformer test, Troubleshooting & repair – Lincoln Electric POWER MIG 255 SVM144-B User Manual

Page 49: Warning

Advertising
background image

Service and repair should be performed by only Lincoln Electric factory trained
personnel. Unauthorized repairs performed on this equipment may result in danger
to the technician or machine operator and will invalidate your factory warranty. For
your safety and to avoid electrical shock, please observe all safety notes and pre-
cautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to per-
form the test / repairs safely, contact the Lincoln Electric Service Department for
electrical troubleshooting assistance before you proceed. Call 1-888-935-3877.

POWER MIG 255

F-11

F-11

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

WARNING

TROUBLESHOOTING & REPAIR

MAIN TRANSFORMER TEST

TEST DESCRIPTION

This procedure will determine if the correct voltages are being:

a.

Applied to the primary windings of the main transformer.

b.

Induced on the secondary and auxiliary windings of the main transformer.

MATERIALS NEEDED

Volt/Ohm Meter

3/8 in. Nutdriver

5/16 in. Nutdriver

Advertising