Front, Negative lead, Troubleshooting and repair – Lincoln Electric POWER MIG 11521 User Manual

Page 58: Output bridge rectifier test (continued)

Advertising
background image

Front

-

+

Negative Lead

FIGURE F.6 – RECTIFIER TEST POINTS

OUTPUT BRIDGE RECTIFIER TEST (continued)

PROCEDURE

1. Remove input power to the Power MIG® 215XT

machine.

2. Using the 3/8” nutdriver, remove the left case

side.

3. Locate and disconnect the negative lead from

the output rectifier bridge assembly. Be sure
there is no electrical contact between the recti-
fier and the lead. See Figure F.6.

NOTE: Do not disassemble the rectifier assembly.

4. Test for “shorted” or “leaky” diodes by checking

from the anodes to the cathodes of the diode
heatsink plates. The readings should be high
resistance in one polarity and low resistance in
the opposite polarity.

5. If any of the diodes are “leaky” or “shorted” the

output rectifier assembly should be replaced.

6. When the test is complete, replace the negative

output lead previously removed.

7. Replace the left case side.

TROUBLESHOOTING AND REPAIR

F-20

F-20

Power MIG® 215XT

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Advertising