Omron ZS-MDC User Manual

Page 35

Advertising
background image

Sect

io

n 2

INSTA

L

LATION &

CONN

ECTION

Section 2

About the I/O cable

2-11

ZS-MDC

User’s Manual

(6) OUT3 (ENABLE output)

This turns ON when the Multi-Controller is ready for measurement. This output is
interlocked with the ENABLE indicator.

(7) OUT4 (BUSY output)

This turns ON during sampling with the hold function enabled. It allows you to check
whether or not the self-trigger is functioning correctly. It also turns ON during bank
switching.

(8) Linear output

The linear output outputs a current or voltage in accordance with the measured
value.

(9) Linear GND

The linear GND terminal is the 0V terminal for the linear output.

This ground wire must be grounded separately from the other ground wires.
Always ground the linear output terminal even when linear output is not used.

(10) to (13) IN0 to IN3

The following input signal assignments can be selected.

• Signal assignments

Setting I/O Assignments p.3-16

• Signal functions

For details on the timing charts of external I/O, refer to User’s Manual for the Sensor Controller.

Signal

When [Standard] is selected

(default)

When [Bank] is selected

IN0

External trigger (timing) input

Bank input A

IN1

Reset input

Bank input B

IN2

Unused

Unused

IN3

Zero reset input

Zero reset input

Signal Name

Description

External trigger (timing) input

This timing input is for signal input from external devices. Use it for hold
function timing.

Reset input

This resets all executing measurements and outputs. While a reset is
being input, judgment output conforms to the non-measurement set-
ting. If this reset input switches ON while the hold function is used, the
state in effect before the hold function was set will be restored.

Zero reset input

This is used to execute and clear a zero reset.

Bank input A, B

This is used for switching banks. Specify the bank No. in combinations
of A and B.

Advertising