Unit start-up, Operation – Trane RT-SVX19A-E4 User Manual

Page 51

Advertising
background image

Operation

51

RT-SVX19A-E4

Unit start-up

Verification of gas valve settings -
(Reserved for the qualified gas
technician)

WARNING! Improper gas valve
setting may lead to burner
destruction and people injury.

Note: Unit factory-set for G20.

Figure 23 - Gas valve

1 = Negative pressure controller
2 = Safety solenoid valve
3 = Gas injector
4 = Air inlets
5 = To the burner
6 = Fan
7 = Gas unit
8 = Minimum gas pressure cut-out

Note: Unit to be installed outside
only.

Note: Expansion valve must be
adapted to the type of gas used:
• G 20: 20 mb
• G 25: 25 mb
• G 31 (Propane): 37 or 50 mb

Advertising