Veris Technologies VIS_NIR Spectrophotometer - Operating Instructions User Manual

Page 20

Advertising
background image

Pub# OM17-NIR Shank

3-1

Section 3

Field Operations: Electronics

Operating software

– Software that will guide the user through the field usage steps.

This will need to be completed every time the software is started. Open Veris operating
software:

Figure 1

Figure 2

Folder icon to select working
directory.
A field folder must be selected
before any steps can be
completed. Note: Each field or
site must have its own folder.

Once the desired
directory is found,
click on current folder.

BEFORE STARTING:

1. Before taking any

data let system run
for 20 minutes to
allow the
spectrometers to
stabilize.

2. Connect

spectrometers to
PC.

3. Open Veris software
4. The port order must

be set (see Setting
Port Order). This
needs to be done
the first time the
software is run on a
machine, after that
the port order will be
stored for future use.
Port terminology
may be labeled
COM or ASRL.
Both are acceptable
if port number is
correct.


Press EXIT or F12 when ready to quit the software; this will
ensure the port order will be saved.

Advertising