VEGA VEGADIF 65 Foundation Fieldbus User Manual

Page 24

Advertising
background image

24

4 Mounting

VEGADIF 65 • Foundation Fieldbus

36130-EN-130417

1. Mount VEGADIF 65 directly to the vessel
2. Minus side is open to the atmospheric pressure

+

min.

p

atm

p

atm

1

2

+

Fig. 21: Measurement setup, level measurement in the open vessel
1 VEGADIF 65

2 Minus side is open to the atmospheric pressure

1. Mount VEGADIF 65 below the lower measurement connection so

that the effective pressure lines are always filled with liquid

2. Connect minus side always above the max. level
3. For measurements in products with solid content such as e.g.

dirty liquids, the installation of separators and drain valves is

recommended to enable collection and removal of debris and

sediment.

+

min.

max.

1

3
4

3
4
5

1

2

Fig. 22: Measurement setup, level measurement in closed vessel
1 Blocking valves

2 VEGADIF 65

3 Separator

4 Drain valves

5 3-fold valve block

In open vessels with

single chemical seal

In closed vessels with ef-

fective pressure lines