4 Mounting

VEGADIF 65 • Foundation Fieldbus

36130-EN-130417

1

2

3

3

5

6

4

4

Fig. 30: Measurement setup with differential pressure measurement between a

vapour and a condensate cable
1 Vapour cable

2 Condensate cable

3 Blocking valves

4 Condensate vessels

5 5-fold valve block

6 VEGADIF 65

1. Mount VEGADIF 65 below the measurement loop so that the ef-

fective pressure lines are always filled with liquid and gas bubbles

can bubble up to the process line

2. For measurements in products with solid content such as e.g.

dirty liquids, the installation of separators and drain valves is

recommended to enable collection and removal of debris and

sediment.

+

1

2

4
5
6

4
5

2

3

Fig. 31: Measurement setup, flow measurement in liquids
1 E.g. filter

2 Blocking valves

3 VEGADIF 65

4 Separator

5 Drain valves

6 3-fold valve block

In liquids