4 Mounting

VEGADIF 65 • Foundation Fieldbus

36130-EN-130417

1. Mount VEGADIF 65 directly to the vessel
2. Connect minus side always above the max. level
3. For measurements in products with solid content such as e.g.

dirty liquids, the installation of separators and drain valves is

recommended to enable collection and removal of debris and

sediment.

+

max.

min.

+

1

2

3

4

Fig. 23: Measurement setup, level measurement in closed vessel
1 Blocking valve

2 Separator

3 Drain valve

4 VEGADIF 65

1. Mount VEGADIF 65 below the lower chemical seal
2. The ambient temperature should be the same for both capillaries
Information:

Level measurement is only ensured between the upper edge of the

lower and the lower edge of the upper chemical seal.

+

min.

max.

1

Fig. 24: Measurement setup, level measurement in closed vessel
1 VEGADIF 65

1. Mount VEGADIF 65 below the lower measurement connection so

that the effective pressure lines are always filled with liquid

2. Connect minus side always above the max. level
3. The condensate vessel ensures a constant pressure on the

minus side

In closed vessels with

single chemical seal

In closed vessels with

double chemical seal

In closed vessels with

steam layering with effec-

tive pressure line