3.6 UNPACKING


Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.

Procedure for the unpacking of the UPS:

1

x Make sure to have sufficient space

around the UPS before you start
unpacking.

x Cut the two straps A fixing the carton

box.

2

LPS33U_

030-040_

Unpacking

_02

B

UL

GRAV

ITY

CENTE

R

of

of

GRAVITY

CENTER

D

C

D igital

Energy

T

M

LP Se ri es

x Remove packageB and C.
x Remove the protection Doutside the

cabinet and the accessories bag.

x Remove the screws on the four small

bracket E.

x Use a forklift to raise the UPS from the

floor.

x Remove the three wooden plates F.

3

Fig. 3.6-1 LP 33 Series unpacking sequence

NOTE !

Be aware of the heavy
weight of the UPS, in
particular if already
equipped with Batteries.


Included in the delivery you can find the following parts:

x CD-ROM connectivity

x Control Bus cables (only for RPA parallel system)

x An accessories bag

NOTE !

The wheels are designed only for limited movements on the installation site.