Installation Guide LP 33 Series 50-60 kVA

3.9.4

RPA system - Control bus connection

WARNING !

This operation must be performed by trained personnel before the initial start-up
(ensure that the UPS installation is completely powered down).

Access to the RPA board

1 - Open the front door A of the UPS

cabinet.

2 - Remove the front panelB.

3 - Remove with appropriate tool the

metallic window C from the metal
screenD.

Fig. 3.9.4-1 Access to the RPA board

NOTE !

Put in place the front screen
“A”
paying attention to not
damaging the control bus
cables.

LP

S

33

U

_0

30

-0

40_

RP

A

c

onn

ec

tion

_GE

_0

2

J4
J3

LP 33 Series

1

P1

P13

P34

P1

J3

P13

J4

P34

LP 33 Series

2

J3

P1

P13

J4

P34

LP 33 Series

3

P34

J4
J3

P1

P13

LP 33 Series

4

Fig. 3.9.4-2 Bus connection RPA parallel system

Bus connection RPA parallel system

Connect the control bus cable between the parallel units as indicated in the diagram Fig. 3.9.5-2.
Provide that the connectors J3 and J4 are properly fixed with the included screws.

NOTE !

The jumper JP1 - JP2 - JP3 must be
removed only on the intermediate units,
where the connectors J3
and J4 are both
inserted.

Do not insert or remove J3 and J4 from
the board “P16 - Connector adapter RPA”

when the parallel system is operating.

P1

J3

P13

J4

P34

LP

S

33

U

_0

30

-0

40

_R

P

A

c

on

ne

ct

ion

_0

3

JP1

JP2

JP3

Fig. 3.9.4-3 Connection to Board P16

Advertising