8 wiring connection – GE Industrial Solutions LP 33 Series 50 & 60 kVA Installation Guide User Manual

Page 27

Advertising
background image

Modifications reserved

Page 27/42

OPM_LPS_3UI_50K_60K_0US_V010.doc

Installation Guide LP 33 Series 50-60 kVA

3.8 WIRING

CONNECTION

WARNING!

UPS installation and connection must be performed by QUALIFIED SERVICE
PERSONNEL only.


3.8.1 Power

connections

Input/output and DC connections are provided with terminal blocks.
Please refer to chart for torque specifications.


Carefully read the following recommendations before proceeding:

x

Ensure that the AC and DC external isolators are OFF and locked to prevent their inadvertent
operation.

x

Do not close any external isolators prior the commissioning of the equipment.

x

The preferred power cable entry location for installation purposes is from the bottom right side of
the UPS (see Fig 3.8.1-1).
For cable entry from the bottom remove the cover plate and provide for a suitable isolated
protection cover.

x

The input/output cables must be connected in clockwise phase rotation for both Bypass and
Rectifier Input Terminals if separate, taking care to avoid risk of short circuit between different
poles.

x

The grounding and neutral connection of the electrical system must be in accordance with local
regulations.

x

In case of additional cabinets containing batteries, input/ output transformers, etc, their ground
terminals must be connected to the UPS main ground terminal.

x

Once the power cables have been connected, re-install the internal safety shields and close the
cabinets by re-installing all external panels.


Torque Specifications

Mechanical Terminals

Input / Output / Battery

UPS Model

WIRE SIZE RANGE

Lb - in

Nm

LP 33 Series / 50 kVA & 60 kVA

Max 350 MCM

88 - 130

10 - 15


Torque Specifications

Mechanical Terminals

GND

UPS Model

WIRE SIZE RANGE

Lb - in

Nm

LP 33 Series / 50 kVA & 60 kVA

Max 350 MCM

375

42


Advertising