GE Industrial Solutions LP 33 Series 50 & 60 kVA Installation Guide User Manual
Page 21
Advertising
Modifications reserved
Page 21/42
OPM_LPS_3UI_50K_60K_0US_V010.doc
Installation Guide LP 33 Series 50-60 kVA
NOTE !
A damaged UPS must never be installed or connected to utility or battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Packing material recycling
GE, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
Advertising