Openings for input and output cable connections, 30 & 40 kva, Sg series – GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 14

Advertising
background image

Openings for input and output cable connections

SG

T5

000

_0

10-

020

_U

PS

vie

w t

op_

01

US

31.

50"

800

mm

9.0

6"

1.58"

40mm

230

mm

9.0

6"

70mm

2.76"

26.78"

680mm

230

mm

Utility input
Output Load
Battery

Fig. 3.4.1-2 Opening on top of the cabinet for input and

cables of SG Series 10 & 20 kVA

SG

T5

00

0_

03

0-0

40

_U

PS

vie

w t

op

_0

1U

S

31.

50"

800

mm

13

.78

"

1.58"

40mm 110m

m

4.3

3"

70mm

2.76"

26.78"

680mm

Utility input
Output Load

Battery

350

mm

Fig. 3.4.1-3 Opening on top of the cabinet for input and

cables of

SG Series

30 & 40 kVA

SG

T5

00

0_0

30

-04

0_

UP

S v

iew

bo

tto

m_

01

US

Utility input
Output Load

26.78"

680mm

7.0

9"

18

0m

m

70mm

2.76"

50mm

1.97"

7.8

8"

20

0m

m

31

.50

"

800

mm

Fig. 3.4.1-4 Opening on the bottom of the cabinet for input and

output cables SG Series 10 - 20 - 30 - 40 kVA

SG Series openings are provided on the
top and the bottom of the UPS for the
connection of input and output cables.

Pay attention to the position of these
openings, when choosing the placement of
the UPS.
These openings are covered with a
protective plate.


Positioning of the UPS cabinet
SG Series
is equipped with wheels for easy
placement of the UPS.

To make the UPS movable on wheels, the bolts
on each leg of the cabinet have to be turned
counter-clockwise, until they are free from the
floor and thus the cabinet supported on
wheels.

After having positioned the UPS at its final
location, the cabinet has to be secured by
rotating the bolts on each leg clockwise, but
the wheels must still touch the floor.

To lower

To lift

Fig. 3.4.1-4 Bolts for the regulation of the cabinet

The UPS cabinet is free
standing and normally does
not require to be bolted to the
floor.
The UPS cabinet can be fixed
however to the floor by bolting
it with the supporting blocks to
the floor.
The supporting blocks can be
used in different positions (0° -
360°)
These supporting blocks are
part of the shipping package.
See Fig. 3.4.1-5.

SGT5000_010-020_UPS

fixing_01

0 - 360°

Fig. 3.4.1-5 Fixing of the UPS cabinet on the floor

Modifications reserved

Page 14/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA

Advertising