GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 31

Advertising
background image

3.8.5 Power connection dual input utility of SG Series 30 & 40 kVA

L1-1

X1

L1

PE

PE

S

G

T

50

00

_03

0-

0

40_

UP

S

c

onnection separ

ate

_01US

L2

L3

N

L2-1

L3-1

N - Bypass

OFF

ON

OFF

ON

2- IN

PU

T B

YP

ASS

L1-2

L2-2

L3-2

X2

L3

L2

L1

RECT

IF

IE

R

1 - INP

U

T

L

OAD

Fig. 3.8.5-1 Power connections Dual Input Utility of SG Series 30 & 40 kVA

SG Series 30 & 40 kVA Max.

rating

X1 and X2 terminals:

1 AWG (50mm

2

)

Dual Input Configuration Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE

N - Bypass

Bypass Neutral

Ground
For dual input configurations, a neutral conductor is required from the bypass source only.
The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.8.5-2).

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground

Cable terminations are to the Rectifier / Bypass Input Terminals and Load Output Terminals as shown
above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.


Modifications reserved

Page 31/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA

Advertising