3.9.3 Control bus cable location

WARNING !

This operation must be performed by trained personnel before the initial start-up.

ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.

SGT

50

00_03

0-040

_R

PA

c

on

tro

l

b

us

c

a

ble_

01

Q1

Q2

ON

OFF

OFF

ON

Access to the control bus connection.

The control bus connection between
parallel units must be made on the front

of the electronic module fitted behind
the front doors.

Fig. 3.9.3-1 View electronic module on intermediate unit


SG

T

5

0

0

0

_

1

0

0

-1

5

0

_

R

P

A

c

ont

ro

l bus

c

able

_02U

S

JB2

JB1

JA2

JA1

A

A

JA

JB

Next parallel unit

Fig. 3.9.3-2 Front view electronic module on intermediate unit

Control bus cables connection.

• Plug the cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) onto the RJ
connectors JA and JB located on
parallel bus PCB P34 – Bus Interface
(going to “P13 – RPA Board” J52(A) and
J62(B).

• Fix both cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) to parallel bus
socket connecting the cable shield to
ground by means the cable clamps

A“.