GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 29

Advertising
background image

3.8.4 Power connection dual input utility of SG Series 10 & 20 kVA

SG

T

5

00

0

_0

10

-0

20

_

U

PS

c

o

nnec

tion

s

eparate_01U

S

L3

L1

L2

2- IN

PU

T

BYPASS

L1-2

L2-2

L3-2

X2

N

L1-1

1 -

IN

PU

T

L

O

A

D

PE

L3-1

L2-1

N - Bypass

L2

L1

L3

R

ECTIFIER

X1

PE

Fig. 3.8.4-1 Power connections Dual Input Utility of SG Series 10 & 20 kVA

SG Series 10 & 20 kVA: Max.

rating

X1 and X2 terminals:

3 AWG (25mm

2

)

Dual Input Configuration Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE

N - Bypass

Bypass Neutral

Ground
For dual input configurations, a neutral conductor is required from the bypass source only.
The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.8.4-2).

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground


Cable terminations are to the Rectifier / Bypass Input Terminals and Load Output Terminals as shown
above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.



Modifications reserved

Page 29/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA